Scaffolding by Plettac Assco – 510 sqm incl. steel frames & timber decks
- frame scaffolding made in germany
- timber decks 2,50 m
- galvanized steel
- used but good condition
- easy to erect and dismantle
- for facades & construction
- additional parts on request
- worldwide shipping
- on stock
Further details
Length of scaffolding | 50,00 m |
Max. working height | 10,20 m |
Max. standing height | 8,20 m |
Field length/scaffolding depth: | 2,50 m / 0,74 m |
Included parts
Quantity | Article description |
---|---|
84 | Steel-Vertical Frame SL W74 200 x 74 |
168 | Timber Deck SL W32 250 x 32 x 4,4 |
180 | Guard rails SL 250 |
8 | Double end guard rail SL 74 |
16 | Diagonal SL 326 (250 x 200) |
4 | Diagonal Fixing Bracket SL |
21 | Steel Guard Rail Post SL 100x 74 |
80 | Toe boards SL 250 |
42 | Base plate 60 |
22 | Wall tie 30 - 65 |
22 | Double coupler |
For further infomation, shipping or additional parts use our eMail-service please.
Assambling
The components can be assembled quickly and easily: Put two vertical frames on two scaffold feet. Now connect the vertical frames with at least one back railing. Now align the scaffold field vertically with a diagonal. To do this, simply slide the ends of the diagonals over the tilt fingers on the outside of the vertical frame. With the Plettac-SL scaffolding, this requires diagonal fastening in the lowest diagonal field. Finally, hang one and then a second wooden floor over the pins on the upper ends of the two vertical frames. How to continue with the other scaffolding fields. You can either block the diagonals one above the other in a tower; alternatively, you can distribute them diagonally in adjacent fields over the scaffold. Plettac wooden floors can be used on both sides and are easy to clean after use.
Subject to errors and prior sale.