857 sqm Scaffolding by Plettac Assco – SL incl. aluminum frames & combi decks
Sample photos from our yard: unless stated otherwise, they do not necessarily show the exact material offered.
Altrad PlettacArt. no. EN-S2246Used · availability on request

857 sqm Scaffolding by Plettac Assco – SL incl. aluminum frames & combi decks

Price on requestWe will send you a free quotation

Please quote article number EN-S2246 in your enquiry. We confirm the current price, availability and freight in the quotation. Write directly

Live prices online: used packages in stock · used parts in stock

Manufacturer
Altrad Plettac
Article number
EN-S2246
Quantity
856 m²
Weight
6,273 kg
Condition
Used
Length of scaffolding
84.00 m
Max. working height
10.20 m
Max. standing height
8.20 m
Field length/scaffolding depth
3.00 m / 0.74 m
  • Material inspected in our yard in Leipzig
  • Shipping worldwide by truck or container
  • Advice and quotation in English

Included parts

QuantityDescription
116Alu-Vertical Frame SL W74 200 x 74
112Alu Frame Deck SL W64 w. Alu Surface 300 x 64
252Guard rails SL 300
8Double End Guard Rail SL74
24Diagonal brace SL 366
6Diagonal Fixing Bracket SL
29Guard Rail Post SL 100 x 74
112Toe board SL 300
58Base plate 60
30Wall tie
30Double coupler

857 sqm Plettac SL incl. Aluminum frames & combi decks -Scaffolding by Assco

  • Aluminum frames 200 x 74
  • Combi decks – aluminum frames & ALU surface
  • lightweight components – easy to handle
  • used in good condition
  • shipping worldwide
  • buy´n´build ready

The offer is an example and can be changed according to your needs. We will make you an individual offer.

For further information, shipping or additional parts use our eMail-service please.

Quick erection guide

The components can be assembled quickly and easily: Put two vertical frames on two base plates. Now connect the vertical frames with at least one back railing. Now align the scaffold field vertically with a diagonal. To do this, simply slide the ends of the diagonals over the tilt fingers on the outside of the vertical frame. With the Plettac Assco SL scaffolding, this requires diagonal fastening in the lowest diagonal field. Finally, hang the aluminum frame board over the pins at the upper ends of the two vertical frames. How to continue with the other scaffolding fields. You can either block the diagonals one above the other in a tower; alternatively, you can distribute them diagonally in adjacent fields over the scaffold.

The main components of this scaffold – the vertical frames and the decks – are made of aluminum. They enable you to work particularly efficiently. The other scaffolding parts are made of steel as standard. This increases the safety of the scaffolding and also favors the price.

Similar offers

Looking for scaffolding or formwork? Our team advises you free of charge and sends you a quotation including freight to your site.