Used Peri Up Easy Scaffolding
Price on requestWe will send you a free quotation
Please quote article number GE2707 in your enquiry. We confirm the current price, availability and freight in the quotation. Write directly
Live prices online: used packages in stock · used parts in stock
Manufacturer
PERI
Article number
GE2707
Condition
Used
- Material inspected in our yard in Leipzig
- Shipping worldwide by truck or container
- Advice and quotation in English
Included parts
| Quantity | Description |
|---|---|
| 431 | Base Spindle UJB 38-50/30 |
| 85 | Base Spindle UJB 38-80/55 |
| 136 | Wall Tie UWT 45 |
| 33 | Wall Tie UWT 110 |
| 25 | Stacking Pallet USP 72 |
| 58 | Head Frame EVH 67 |
| 503 | Easy Frame EVF 67 |
| 277 | Base Frame EVB 67 |
| 384 | Tube EVR 150 |
| 359 | Guardrail Post EVP |
| 138 | Base Compensation EVA 67/50 |
| 66 | Base Compensation EVA 67/100 |
| 48 | Wall Tie Coupler EWC |
| 10 | Stacking Pallet ESP 67 |
| 8 | Access Deck EAW-2 67 x 300-L |
| 24 | Access Deck EAW-2 67 x 250-L |
| 1 | Flex Stair UAS 75 x 150/50 T |
| 1 | Flex Stair UAS 75 x 150/100 |
| 13 | Flex Stair UAS 75 x 250/200 |
| 1 | Scaffold Stair UAS 67 x 300/200 |
| 125 | UH Spigot-2 |
| 28 | Advance End Guardrail UPA-2 67 |
| 146 | Toeboard Steel UPY 67 |
| 22 | Toeboard Steel UPY 100 |
| 33 | Toeboard Steel UPY 150 |
| 71 | Toeboard Steel UPY 200 |
| 314 | Toeboard Steel UPY 250 |
| 117 | Toeboard Steel UPY 300 |
| 75 | Pin with Spacer Tube URE 4/42 |
| 25 | Swivel Coupler Ø48/48 mm, galvanised |
| 239 | Standard Coupler RA Ø48/48 mm, galvanised |
| 2 | Scaffolding Tube 48.3 x 3.2 mm, 3 m, galvanised |
| 4 | Stacking Pallet USP 104 |
| 10 | Crate Pallet 80 x 120-K, painted |
| 6 | Pallet RP-2 80 x 120, galvanised |
Used Peri Up Easy Frame Scaffolding.
| Bezeichnung DE | Description EN | Menge / Qty |
| Base jack UJB 38-50/30 | Base Spindle UJB 38-50/30 | 431 |
| Base jack UJB 38-80/55 | Base Spindle UJB 38-80/55 | 85 |
| Wall tie UWT 45 | Wall Tie UWT 45 | 136 |
| Wall tie UWT 110 | Wall Tie UWT 110 | 33 |
| Rungenpalette USP 72 | Stacking Pallet USP 72 | 25 |
| Head frame EVH 67 | Head Frame EVH 67 | 58 |
| Easy frame EVF 67 | Easy Frame EVF 67 | 503 |
| Base frame EVB 67 | Base Frame EVB 67 | 277 |
| Tube EVR 150 | Tube EVR 150 | 384 |
| Guard rail post EVP | Guardrail Post EVP | 359 |
| Basisausgleich EVA 67/50 | Base Compensation EVA 67/50 | 138 |
| Basisausgleich EVA 67/100 | Base Compensation EVA 67/100 | 66 |
| Wall tie coupler EWC | Wall Tie Coupler EWC | 48 |
| Rungenpalette ESP 67 | Stacking Pallet ESP 67 | 10 |
| Ladder access deck EAW-2 67×300-L | Access Deck EAW-2 67 x 300-L | 8 |
| Ladder access deck EAW-2 67×250-L | Access Deck EAW-2 67 x 250-L | 24 |
| Scaffold stairway UAS 75×150/50 T | Flex Stair UAS 75 x 150/50 T | 1 |
| Scaffold stairway UAS 75×150/100 | Flex Stair UAS 75 x 150/100 | 1 |
| Scaffold stairway UAS 75×250/200 | Flex Stair UAS 75 x 250/200 | 13 |
| Scaffold stairway UAS 67×300/200 | Scaffold Stair UAS 67 x 300/200 | 1 |
| UH spigot 2 | UH Spigot-2 | 125 |
| Advance end guard rail UPA-2 67 | Advance End Guardrail UPA-2 67 | 28 |
| Toe plate, steel, UPY 67 | Toeboard Steel UPY 67 | 146 |
| Toe plate, steel, UPY 100 | Toeboard Steel UPY 100 | 22 |
| Toe plate, steel, UPY 150 | Toeboard Steel UPY 150 | 33 |
| Toe plate, steel, UPY 200 | Toeboard Steel UPY 200 | 71 |
| Toe plate, steel, UPY 250 | Toeboard Steel UPY 250 | 314 |
| Toe plate, steel, UPY 300 | Toeboard Steel UPY 300 | 117 |
| Spigot with spacer tube URE 4/42 | Pin with Spacer Tube URE 4/42 | 75 |
| Swivel coupler Ø 48/48 mm, galvanised | Swivel Coupler Ø48/48 mm, galvanised | 25 |
| Right-angle coupler Ø 48/48 mm, galvanised | Standard Coupler RA Ø48/48 mm, galvanised | 239 |
| Scaffold tube 48.3 × 3.2 mm, 3 m, galvanised | Scaffolding Tube 48.3 x 3.2 mm, 3 m, galvanised | 2 |
| Rungenpalette USP 104 | Stacking Pallet USP 104 | 4 |
| Gitterbox 80×120-K lack | Crate Pallet 80 x 120-K, painted | 10 |
| Palette RP 80×120/2 vz | Pallet RP-2 80 x 120, galvanised | 6 |
Price is Ex-work Leipzig, Germany.
Subject to being unsold.
Partial purchase is possible.
Similar offers
Price on requestfree quotation
Peri Up Scaffolding – 30,2 ton2 – Assortment of Items
Price on requestfree quotation
Peri Up Scaffolding – 34,6 tons – Assortment of Items
Price on requestfree quotation
PERI UP T72 Frame Scaffolding Items
Price on requestfree quotation