Buy new scaffolding – packages and parts
New frame and modular scaffolding of our own design: 847 complete scaffold packages and 989 parts from the CETRAC catalogue.
Which system suits your work?
SPEED frame scaffold
Ready to order today. 0.73 m frames, bays up to 3.07 m, load class 3.
MODUX modular scaffold
Rosettes every 0.50 m for irregular plans, plants and access towers. DIBt approval procedure not yet completed.
MGS-A with quick lock
Facade scaffold with advance guard rail that locks itself once dropped into place. Our first choice. DIBt approval procedure not yet completed.
MGS-K with tilting pin
The same advance guard rail principle, held by a proven tilting pin. DIBt approval procedure not yet completed.
Order SPEED today. Deliveries of MODUX and MGS start in 2027 – reserve your quantity today. Payment by bank transfer before loading.
ReserveNew scaffold packages by system
New parts by system
All 989 new parts ›Extend or complete your CETRAC fleet: every new part can be ordered individually, in any quantity.
CETRAC SPEED
Frame scaffolding
68 parts · Frames, Decks, Access decks, Guard rails, Toe boards, Diagonal braces …
Available now · lead time on request · German approval (DIBt) granted
Order parts ›CETRAC MODUX
Modular scaffolding with rosettes
539 parts · Standards, Decks, Access decks, Guard rails, Toe boards, Diagonal braces …
Available from 2027 · approval procedure not yet completed · pre-orders possible
Order parts ›CETRAC MGS-A
Modular facade scaffold, advance guard rail with quick lock
115 parts · Standards, Decks, Access decks, Guard rails, Toe boards, Diagonal braces …
Available from 2027 · approval procedure not yet completed
Order parts ›CETRAC MGS-K
Modular facade scaffold, advance guard rail with pin connection
267 parts · Frames, Standards, Decks, Access decks, Guard rails, Toe boards …
Available from 2027 · approval procedure not yet completed
Order parts ›Few parts, quick to erect, ready to order
SPEED is built for contractors who put up straight facades week after week: rendering, external insulation, painting and brickwork. Decks, guard rails and diagonals fit onto the galvanised steel frame without tools, and every bay goes up the same way as the one before.
The system holds German general building approval Z-8.1-936 from the DIBt. Complete packages and single parts can be ordered now; we confirm the lead time in the offer.


For everything that isn’t a straight wall
Each standard carries a rosette every 0.50 m with eight connection points. Ledgers, transoms and diagonals are fixed with a wedge, square or at an angle as the layout demands. One set of parts covers building corners, stair towers, bridges and industrial plant.
MODUX ships from 2027. DIBt approval procedure not yet completed. Quantities can be reserved now.


Placed from below, the guard rail locks by itself
MGS-A replaces frames with standards. Standing on the level that is already protected, the erector lifts the guard rail for the next lift onto the quick lock (patent pending) and lets go – it is held. No pins to fit, no tools.
Erectors are never on an unprotected deck, which is what collective-protection rules for scaffold erection ask for. Decks and brackets from your current fleet stay in use, and your frames can be taken back through our exchange offer.
Ships from 2027. DIBt approval procedure not yet completed.
Plastic flap, tilting pin or quick lock?
There are three designs for advance guard rails. The video walks through all three and shows how to move from frame scaffolding to MGS-A: what gets exchanged and what stays in your fleet.
With English subtitles.
Same principle, with a tilting pin
MGS-K follows the same advance guard rail idea as MGS-A. The guard rail is secured by a tilting pin on the standard – a connection many erectors already know. Which of the two suits you best mostly depends on how your crew likes to work.
As with MGS-A, your decks and brackets stay in service. Ships from 2027. DIBt approval procedure not yet completed.


Why new CETRAC scaffolding?
Developed by a specialist
More than fifteen years of scaffolding trade: we know what wears out, what breaks and what costs time on site.
Hot-dip galvanised steel
Lasting corrosion protection: the material serves for years and keeps its resale value.
New and used from one supplier
Extend a new fleet with inspected used material, or the other way round – one contact for both.
International delivery
Offers, loading plans and documentation in English, delivery by truck or container.
Technical data sheets, catalogues and instructions for the CETRAC systems are available on cetrac.com or on request. Lead times and approval status are subject to change; we confirm them in the offer.

